Search page
We found 1638 search results.
Narrow the search result by using the filters.
You can also find relevant contacts and locations here
Showing 51-60 of 1638 search results-
Wilhelmsen insights | Updated
Prepare for a low GWP future
New F-gas regulation was introduced in the EU - January 2015. All vessels today have requirements for refrigeration on-board. The following paper states how, and what will be restricted. The Council of the European Union has passed the revised F-gas regulation
-
Wilhelmsen insights |
Electric Arc Welding Onboard: Essential Safety Checks and Precautions
It is crucial that welding equipment and gases are handled in a safe and secure way - safety in operation must always be a priority. Take note of these safety checks and precautions that crew should adhere to before and during electric arc welding onboard. Ships
-
Wilhelmsen insights |
Corrosion Prevention in Steam Boiler Systems
The most common failure and repair issue is the damaging effects of corrosion - it is estimated that the cost of boiler repairs due to corrosion can be in the order of $50,000 to over $1m, plus cost of time off hire. The majority of Marine steam boiler systems
-
UNITOR MAIN FILTER CARTRIDGE SET
-
CORROSION BLOCK 20 -1.5" (STARTER KIT)
-
CORROSION BLOCK 20 -1.5" (REPLACEMENT KIT)
-
CORROSION SHIELD 20 -1.5" (REPLACEMENT KIT)
-
CORROSION SHIELD 20 -1.5" (STARTER KIT)
-
NATURAL HANDCLEANER ( 4X5 LTR IN BOX)
-
SOX GUARD (CAUSTIC SODA 20-50%)
-
O-RINGS SET OF 4 F/WELD./CUTT. ATT.
-
60 ML SAMPLE BOTTLE
-
30 ML AMBER GLASSBOTTLE