Supplier brand guide search

We found 1814 search results.

You can search the Supplier brand guide here

Showing 141-150 of 1814 search results
    • Product
      WSS port agent  operations

      All in-port services

      We perform all in-port services needed, like vessel boarding, monitoring of vessel operations and coordination of booked services, i.e. tank cleaning.
    • Product
      Pre departure planning

      Pre-arrival Planning

      We perform pre-arrival planning for your port call, including e.g. coordination of vessel service, cargo and documentation.
    • Product
      Post port departure

      Post departure follow up

      We perform thorough follow-up with information and communication with regards to cost and disbursement accounts.
    • Product
      Wells drilling project

      Well Drilling, Iraq

      Mobilization of rigs with camp from Kuwait to Iraq with over 130 trucks dispatched.
    • Product
      Qatar - Plant Expansion - Thumbnail

      Oil & Gas, Qatar

      Plant expansion - 147,000 tons of cargo transported in gas-debottle necking project.
    • Product
      Exploration Drilling - Moving Generator

      Transporting Generators, Norway

      Moving generator “made to fit” a tunnel 500 meters inside a mountain. Total of 40 parcels with the heaviest weighing 80 tons.
    • Product
      Handling of gas turbines - power plant

      Power Plant, Mew-Kuwait

      Handling of Gas Turbines and Generators ranging from 234 tons to 279 tons as well as cross loading onto receivers trailers.
    • Product
      mobilisation

      Step 4: Demobilisation

      Plans to dispose assets, redeploy or dismiss personnel and possibly reinstate premises to their pre-project condition are created and executed.
    • Product
      execution logisitics

      Step 3: Execution

      Operations begin. Monitor and control processes are implemented to manage time, cost, quality, change, risks and issues, as well as procurement and communication.
    • Product
      mobilisation of resources

      Step 2: Mobilisation

      Materials and equipment are incorporated into the project and arrangements for personnel and other essential resources are organised.
  • HEAVY DUTY VACUUM PUMP 115/230V UVP1580-A3


  • FULL FACE MASK


  • CHEMICAL SUIT SIZE L


  • CHEMICAL SUIT SIZE XL


  • CHEMICAL GLOVES ONESIZE


  • REFRIGERANT CYL. VALVE ADAPTOR SET


  • OIL SPILL KIT GLOVES - ONE PAIR..


  • OILSPILL MARPOL KIT 12 BARREL(2 PALLETS)


  • Q. COUPLING, MALE 3/4"


  • CONNECTION NIPPLE SS FOR MULTIPLE HP HOSES