Search page

We found 6092 search results.

Narrow the search result by using the filters.

You can also find relevant contacts and locations here

Showing 3561-3570 of 6092 search results
    • Product
      800 x 450 IMO Process 3

      Step 3: Delivery

      We will arrange for transportation and accommodation for the cleaning crew, and arrange prefunding and invoicing on behalf of suppliers through DA.
    • Product
      800 x 450 IMO Process 2

      Step 2: Booking

      Once the scope is clear, we will provide price and time and coordinate with the cleaning crew
  • Contact

    Callan Mercer

    Ships Agency Operator Gladstone

    E-mail:

    • Product

      Step 2: Booking

      Once the scope is clear, we will provide price and time and coordinate with the cleaning crew.
    • Product
      800 x 450 IMO Process 1

      Step 1: Scoping

      To prepare for the vessel’s arrival, we collect the following info: Size and number of tanks, Amount of time allocated for the service, Whether the vessel will provide food/consumables, Whether waste disposal is required
  • Product |
    meg4 landing page hero

    Navigating Through New Mooring Guidelines

    OCIMF has issued a new mooring equipment guideline, establishing new generic terminology, together with new test methods and rope management recommendations. Wilhelmsen Ships Service provides technical rope expertise and MEG4 certificates for Timm ropes, following

    • Product

      Product group: GB
      GB TEST
    • Product
      1107853726137483264_resized

      Lifespan of Ropes

      Determining the exact lifespan of a rope can be difficult, as there are numerous factors that can influence how long a rope can be used on board a vessel. In this article, the factors that affect a rope's service life and actions you can take to prolong the rope's lifespan will be discussed.
  • Updated

    Request for Dry Docking Quotation: Turkey

    Please fill up the form below to get a dry docking quotation and we will get in touch with you shortly.