Mississippi River

The Louisiana Maritime Association has announced temporary obstruction of the Mississippi River until 10 August 2017.
Port news, Published:

M/V Pine Bluff will be conducting rock operations at MM 105.4 AHP (above head of passes) RDB (right descending bank). Operations will be conducted between 0700 hrs and 1700 hrs LT daily, seven days a week. All vessels should contact the tug Pine Bluff on CH 67 or CH 08 before transiting the area. Minimum wake and wide breadth will be required. 

Subscribe to #Portnews

Sign up for #Portnews