Operation
The nozzle of the injector is inserted into a suitable part of the boiler and an air supply is attached to the air hose connection. The valve is opened allowing air to be blown into the boiler while soot remover is being fed simultaneously into the funnel and is carried with the air into the combustion zone.
For further details of soot remover usage and consumption, refer to the soot remover data sheet.
Note
A. Place outlet from injector in same direction as gas flow.
B. Prevent bends in injection pipe, if not possible make bends of 45°, only last bend 90°.